Saturday, June 7, 2014

Bathroom Renovation: Day 2

Bathroom Renovation Day 2 showed some serious progress. I was thrilled when I got home yesterday to find that what was a terrible mess, was now a stripped-down, and cleaned up version of our gutted bathroom. 
Where the toilet once was...

Where the sink and the wall used to be...

A view from the closet doorway into what will become the shower!

They made a lot of progress on Friday! The door to the closet was removed and the closet was gutted. The wall between the bathroom and the closet was removed to reveal the soon-to-be shower. The tile floor in the bathroom was removed and filled in with backer board and the gray toilet was finally moved to the flat bed trailer in our driveway with the rest of the debris.
Top Left: Before, Bottom Left: Day 1, Right: Day 2

Top Left: Before, Bottom Left: Day 1, Right: Day 2
So, what's left? In the next week or so they'll be closing up the closet doorway and creating a solid wall in the guest bedroom. New sheet rock will be hung in the bathroom, Adam and I will tile the floor, the contractor will do the pan and waterproof the shower area, the new toilet, sink, and light fixture will be installed and then we'll be in charge of painting and trimming and tiling our new shower. There is still a lot to be done, but this progress makes me excited! We're getting there!

No comments:

Post a Comment