Wow! We've made some serious progress this week! Days 4 and 5 of the bathroom renovation were packed with exciting new elements. on Day 4 the contractor installed the new fan, and started installing some of the new plumbing fixtures, as much as they can at this point. They also framed in the new wall to create an opening into our new shower.

We grouted the bathroom floor, and tried to do a little cleaning up. Here are some photos from Day 4!
A sneak peek at the opening to the shower and the base for the new shower knob!
It's the little things, people...
The new bathroom fan...
Where our new shower head will eventually hang...
The newly grouted floor...


Up close and personal with the newly grouted floor...
Day 5 brought possibly one of the most exciting moments so far. You see, during this renovation, we've been confined to a guest bedroom that is packed with excess furniture from both our bedroom and the other guest bedroom, while this project and all that goes with it has been spread out over three rooms. On Day 5, we got our wall back in the guest bedroom.

Before we could get the wall back though, we had to lose the entire wall...



A view from our bedroom, through the bathroom, and into the guest bedroom!
A view of the missing wall...
And finally...the wall..

The guest bedroom walls are done in this paneling, so naturally we replaced it with paneling. We'll be painting it as soon as we can (because let's be honest...that is not attractive), but in the meantime, we're thrilled to have a wall.

We ended Day 5 by cleaning up the guest bedroom and it felt pretty nice to get one room back in order! Cheers to the weekend and being a few steps closer to completion!